Tag Archives: Liz Essex

Day 1 Shoot: Alley Way

Time for Production. Today saw us move from pre-production to production with our first shoot for the Alley Way scene. As the Alley Way isn’t far from DeeJay’s house, the equipment was left overnight at his house as it meant … Continue reading

Posted in 311MC, Production | Tagged , , , , , , , , | Leave a comment

Storyboarding

I decided to start storyboarding the film shot for shot as Liz Essex had yet to start (she is also a University herself and has been rather busy.) I began this process on Monday morning (1/3/10) and I have only just … Continue reading

Posted in 311MC, Pre-Production | Tagged , , , | Leave a comment

Costume Designs

Liz has now finished the Designs for each character including the thugs. Both DeeJay and I are extremely impressed with her designs even though they have strayed a little from what we originally envisaged. Having said this, what she has … Continue reading

Posted in 311MC, Pre-Production | Tagged , , , | Leave a comment

Premlinary Sketches

Having gone home to London to take the Office Recce Shots, I decided to utilise my Dad’s drawing skills as an Architect in order to produce a series of sketches. I wanted him to draw one sketch for a defining moment in each scene in … Continue reading

Posted in 311MC, Pre-Production | Tagged , , , , , , | Leave a comment

Weekly Diary – Overview of 8/2/10 – 14/2/10

By the end of this week, the third draft of the script was completed. We finished it to a standard that we are happy with and at 14 pages is just about right in length. By revising the script, we … Continue reading

Posted in 311MC, Pre-Production | Tagged , , , , | Leave a comment

Weekly Diary – Overview of 1/2/2010 – 7/2/2010

After Thursday’s session (28/1/10) with Script Writer Leslie and Adrian, DeeJay and I decided to re-work our idea. We had an idea of our narrative but it proved to be a little weak and needed padding out. Whilst reading through … Continue reading

Posted in 311MC, Pre-Production | Tagged , , , , , , | Leave a comment

Costume Design – Liz Essex

On Saturday 6th February, DeeJay and I met with Liz Essex in London to discuss Costume Design. DeeJay contacted Liz (who is his girlfriend and is currently in her 2nd year at Rose Bruford studying Theatre Design) during the week and … Continue reading

Posted in 311MC, Pre-Production | Tagged , , , | Leave a comment